Netcup Webmaster Toolbox
Interactive calculators, calendar reminder generators, and 5-datacenter speedtest mirrors for Netcup users.
🧮 0% VAT Calculator & Net Pricing Table
Dedicated page with full EU Gross vs Non-EU Net G12.5 comparison
📅 31-Day Cancellation Calculator & BGB Rules
Dedicated page with contract interval breakdown & .ics generator
🌍 5-Datacenter Looking Glass & Peering Table
Dedicated page comparing Nuremberg, Vienna, Amsterdam, US & SG
Netcup 0% VAT & Currency Converter
Customers outside the European Union qualify for 0% German VAT on all Netcup products.
Tip: Always pay in EUR with a fee-free credit card or choose bank conversion in PayPal to avoid high currency exchange fees.
Netcup 31-Day Cancellation Deadline Calculator
Never miss a cancellation window. Netcup contracts renew automatically unless cancelled at least 31 days prior to renewal in the CCP.
Generates an .ics event with an alert 7 days before your deadline.
Netcup Official Looking Glass & Datacenter Speedtests
Use official Looking Glass endpoints and speedtest files to benchmark ping latency, MTR routing, and network throughput across all 5 global datacenters (Nuremberg, Vienna, Amsterdam, Manassas, Singapore).
Nuremberg (Germany - Main DC)
Vienna (Austria - Interxion DC)
Amsterdam (Netherlands - AMS-IX Hub)
Manassas (USA / North America)
Singapore (Asia - APAC Hub)
Netcup Official 2.5 Gbit/s Port & Fair-Use Traffic Policy
- ▪ Standard Uplink: 2.5 Gbit/s high-speed burst port included as standard.
- ▪ 24h Threshold: If total traffic in the past 24 hours exceeds 3 TB, the port is temporarily throttled to 300 Mbit/s.
- ▪ Auto-Reset: The restriction is automatically removed as soon as the rolling 24-hour traffic condition is no longer met.
- ▪ Standard Uplink: 2.5 Gbit/s shared high-speed backbone connection.
- ▪ 24h Threshold: If average traffic in the past 24 hours exceeds 2 TB, the port is temporarily throttled to 200 Mbps.
- ▪ Auto-Reset: The throttle is automatically lifted once the condition clears. Zero billing surprises.